Nov 16, 2026 · 

In 1821, Boston investors bought farmland around Pawtucket Falls on the Merrimack River. They weren’t particularly interested in farming. They wanted the 32-foot drop in the river and the power it could produce. Within a few years, Lowell, Massachusetts, had become one of America’s first great industrial cities.

Two hundred years later, we’re watching a version of that same land grab unfold in Loudoun County, Iowa and West Texas. Different buyers, different technology, same basic economics. The factory follows the power.

I’ve spent nearly 25 years watching the energy industry reinvent itself, often while insisting this time will be different. Lately, the question I hear most is whether we’re headed for another overbuild.

It’s a fair question. But I think we’re asking it about the wrong assets.

Industry has always built its own power

There’s nothing particularly new about large industrial customers wanting to control their electricity supply.

In 1910, most U.S. electricity generation came from plants owned by factories themselves. Utilities eventually won those customers over, but the pendulum has swung back more than once.

After Congress passed PURPA in 1978, cogeneration grew from roughly 10 GW in 1981 to nearly 46 GW in 1996, with Texas refineries and petrochemical plants among the biggest adopters.

Sound familiar?

Today’s hyperscalers are following a playbook industrial America knows well. When the grid can’t deliver what you need, on your schedule, you find another way to secure power.

The difference today is the speed and scale.

We’ve seen the overbuild movie before

The energy industry has a long history of getting demand forecasts wrong. And when cheap capital meets overly optimistic projections, things can get expensive.

Samuel Insull built one of America’s largest utility empires before it collapsed under debt in 1932, leaving roughly 600,000 shareholders with losses.

In the 1970s, utilities were planning around 7% annual electricity demand growth. Actual growth fell well short of expectations, and more than 120 nuclear reactor orders were eventually canceled.

Then came the merchant power boom.

Between 1995 and 2001, developers started more than 200 GW of mostly gas-fired generation, much of it without long-term contracts. Mirant and NRG filed for bankruptcy in 2003. Calpine followed in 2005.

Duke Energy eventually sold eight Southeast gas plants totaling 5,325 MW for $475 million, a fraction of their original cost.

But Duke had something the merchant generators didn’t: a regulated utility business that continued generating revenue while the company worked through its merchant exposure.

That’s a distinction worth remembering as capital pours into AI infrastructure.

The lesson wasn’t that America didn’t need electricity. It was that developers built too much speculative capacity, in the wrong places, with the wrong capital structures.

And the companies that survived the cycle were positioned to buy assets at a discount.

Regulation usually caught up afterward. From state utility commissions to PURPA, wholesale market restructuring and interconnection reform, the rules have often followed changes already underway in the market.

We’re in another one of those periods now. Texas’s large-load requirements and evolving federal policy will help determine who bears the costs of serving the next generation of industrial demand.

So, are we about to overbuild again?

Of course some of it will be overbuilt. We always do this.

Some announced data centers will never break ground. Others will change hands before construction. And plenty of developers will discover that a land option, a power request and a press release don’t make a financeable project.

SoftBank recently offered an expensive reminder, recording a $3.7 billion loss tied to changes in its procurement strategy for data center power equipment.

But I wouldn’t confuse an overbuild in data center announcements with an overbuild in electricity supply.

Between 2005 and 2020, U.S. electricity demand barely moved, growing roughly 0.1% annually. More recently, growth has accelerated. Data centers accounted for approximately 4.4% of U.S. electricity consumption in 2023, with federal researchers projecting that share could reach 6.7% to 12% by 2028.

Texas offers a useful reality check.

ERCOT’s November assessment identified approximately 177 GW of requested interconnection capacity, including 166 GW from large loads. That’s more than twice the state’s historical peak demand.

Of course, those requests aren’t the same as committed, financeable projects. Not even close.

But they illustrate the scale of the infrastructure challenge.

After years of relatively flat demand, we’re trying to accommodate a new class of industrial customer that wants enormous amounts of reliable power, often on timelines our grid was never designed to meet.

So yes, I expect a shakeout in speculative data center development.

What I don’t expect is a nationwide surplus of deliverable, reliable power anytime soon. Some regional markets may have excess capacity, but that doesn’t solve a shortage somewhere else.

The real question isn’t whether every announced data center gets built. It won’t.

It’s whether we can deliver enough power, in the right locations, to customers who actually need it.

Follow the capital, but watch the contracts

Capital is already separating projects that make sense from those that simply look good on paper.

Regulated utilities are preparing for another major investment cycle. Southern Company has discussed a five-year capital plan approaching $100 billion, with the overwhelming majority directed toward regulated operations.

Meanwhile, private infrastructure capital is moving aggressively into existing generation and assets with contracted revenue.

Consider NRG’s November agreement to sell 4.9 GW of natural gas generation to LS Power for $4 billion.

The same LS Power that bought Duke’s merchant plants twenty years ago is back buying power plants.

There’s some irony in that. And a lesson.

Existing generation with access to transmission, fuel and established markets has become increasingly valuable, particularly when building replacement capacity can take years.

For investors, the distinction is becoming clearer. A project with a credible customer, secure fuel supply, deliverable power and a sensible capital structure has a very different risk profile from speculative development counting on demand to show up later.

Merchant markets will continue to create opportunities, and some of the best returns may come from acquiring assets when others get their timing wrong.

But debt still has to be serviced. Customers still have to pay. And electricity still has to get from where it’s generated to where it’s needed.

No amount of enthusiasm for AI changes those fundamentals.

The land is where this gets interesting

Here’s where I think the next chapter looks different from the last few energy cycles.

For years, developers could secure acreage, pursue an interconnection agreement and work through the rest of the project as it matured.

That approach is getting harder.

Today, the value of a site increasingly depends on what’s already around it. Transmission capacity, natural gas infrastructure, water, fiber, existing industrial activity and a community willing to support development can make the difference between a viable project and an expensive piece of dirt.

We’re seeing that firsthand across Texas.

A parcel next to an existing power corridor or natural gas pipeline may offer a developer options that land just a few miles away cannot. And with equipment lead times stretching years into the future, those advantages matter more than ever.

This is also why I think landowners need to pay attention.

The value being created isn’t necessarily in the acreage itself. It’s in what that acreage can enable.

For developers and investors, that means doing the infrastructure homework before making big commitments. For landowners, it means understanding what they control before signing it away.

The next round of winners won’t necessarily be the companies with the largest development pipelines.

They’ll be the ones with the best sites, credible customers and enough capital discipline to get through the cycle.

History doesn’t repeat perfectly, but the economics look familiar

I’ve seen enough energy cycles to know that the best opportunities don’t always belong to the first company announcing a project or the one raising the most money.

They often belong to the people who understand what makes a project work before everyone else figures it out.

And when the market gets ahead of itself, patient capital usually has its moment.

The investors at Pawtucket Falls understood something 200 years ago that still applies today. They secured the scarce resource first and built the business around it.

For all the talk about AI changing everything, that fundamental hasn’t changed much.

The scarce resource isn’t just land. It’s land with a realistic path to power.

And heading into 2027, I suspect we’re going to find out who really understands the difference.

Emily Brown Easley is the founder and managing partner of NOVUS Energy Advisors, advising energy, infrastructure and capital markets executives on commercial power strategy, project development and investment opportunities.